Orders arrive. The sales order is in your ERP.
In between, today, sits the typing. The software takes that over; checking and approving stay with your team.
The gap
Orders arrive as PDFs, and someone types them in. The clean fix is EDI, a fixed interface between two systems. One connection costs about 10,000 euros. The business where we started has around forty customers.
One line, typed into the ERP by hand. One letter off, and it is the wrong item.
Hours a month spent typing in orders
From our experience, based on 21 working days a month.
How the order entry works.
It prepares the sales order completely and puts the decision in front of one of your employees.
What goes in
Orders as they reach you: as a PDF or email attachment, several pages long, in any layout.
What comes out
A complete order proposal with customer, addresses, dates and every line from your item catalogue. After approval it is in your ERP.
What changes
Orders are checked instead of typed in. Preparation starts as soon as an order arrives, and every correction stays in the system.
That together is the order entry.
- Is the result always right?
- No. That is why an employee approves. And before we talk about terms, the feasibility check tells you what to expect.
- Does it run fully automatically?
- Not by default. If you come to trust a process, you can let it run through. You decide.
Purchasing and stock
Order confirmations are held against the order, requirements bundled by supplier, stock and consumption shown side by side. All in the same installation.
How we can tell something is worth automating
- It happens every day.
- Putting together a report once a quarter is not worth it. Typing in twenty orders every morning is.
- There is a rule behind it.
- The order says “cut-resistant glove, size 9, blue”, and your clerk knows which item is meant. That kind of knowledge can be captured.
- We can reach the information.
- A PDF, an email, a database, an interface. If it only exists in someone's head, we tell you so.
- It is too specific for standard software.
- And too small for an integration project. That gap is where we work.
How working with us runs
Feasibility check.
We look at what can be built in your business and tell you what to expect.
on request
Build.
Fixed price and fixed scope, both in writing, before we start. Typically 5 to 6 weeks from project start. If your ERP is not connected yet, it is a design-partner project: we tell you beforehand what it costs and how long it takes.
fixed price
Operation.
We host, maintain and keep your installation running. Billed monthly by the number of your documents.
monthly
The next build.
The next process still done by hand in your business. With its own quote.
Can this be built in your business?
Write to us about what runs by hand in your business. We reply within one working day.